{"id":6909,"date":"2026-11-19T10:56:37","date_gmt":"2026-11-19T09:56:37","guid":{"rendered":"https:\/\/bsiw.pl\/?p=6909"},"modified":"2026-11-19T10:57:12","modified_gmt":"2026-11-19T09:57:12","slug":"successful-claim-for-payment-of-contractual-penalties","status":"publish","type":"post","link":"https:\/\/bsiw.pl\/en\/successful-claim-for-payment-of-contractual-penalties\/","title":{"rendered":"Successful Claim for Payment of Contractual Penalties"},"content":{"rendered":"<p>On 15 September 2026, the Regional Court in Pozna\u0144 awarded our client a total of more than PLN 300,000 in contractual penalties, default interest and litigation costs.<\/p>\n<p>As part of an investment project involving the development of a logistics centre, our client had entered into a design-and-build contract with a contractor. The contractor was responsible for preparing the design documentation, obtaining a building permit, and constructing and handing over an office building with a hall for use. The value of the investment exceeded PLN 1,500,000.<\/p>\n<p>The contractor failed to fulfil its contractual obligations. It neither prepared a proper and complete construction design capable of supporting an application for a building permit nor obtained the required third-party approvals, in particular from Poland&#8217;s General Directorate for National Roads and Motorways (GDDKiA). Our client therefore withdrew from the contract and charged the maximum contractual penalties provided for under its terms.<\/p>\n<p>As the contractor did not pay the contractual penalties voluntarily, lawyers from the litigation department of Babiaczyk Skrocki i Wsp\u00f3lnicy prepared and filed a claim for payment on our client&#8217;s behalf. In its defence, the contractor relied on the excessive length of the administrative proceedings and alleged irregularities on the part of the building control authorities. The Court nevertheless accepted our client&#8217;s position and upheld the claim in full in the judgment referred to above.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Regional Court in Pozna\u0144 upheld our client&#8217;s claim against a construction contractor in full. The award exceeds PLN 300,000 in contractual penalties, default interest and litigation costs.<\/p>\n","protected":false},"author":2,"featured_media":6900,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"class_list":["post-6909","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/bsiw.pl\/en\/wp-json\/wp\/v2\/posts\/6909","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bsiw.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bsiw.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bsiw.pl\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/bsiw.pl\/en\/wp-json\/wp\/v2\/comments?post=6909"}],"version-history":[{"count":1,"href":"https:\/\/bsiw.pl\/en\/wp-json\/wp\/v2\/posts\/6909\/revisions"}],"predecessor-version":[{"id":6910,"href":"https:\/\/bsiw.pl\/en\/wp-json\/wp\/v2\/posts\/6909\/revisions\/6910"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bsiw.pl\/en\/wp-json\/wp\/v2\/media\/6900"}],"wp:attachment":[{"href":"https:\/\/bsiw.pl\/en\/wp-json\/wp\/v2\/media?parent=6909"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bsiw.pl\/en\/wp-json\/wp\/v2\/categories?post=6909"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}